TRAMBOLIN MAINTENANCE and USE

Spring control

The springs in the trampoline should be checked periodically, and the spring that is displaced should be replaced. (daily)
Broken and opened springs should be replaced with a spare. (daily)
The springs should be cleaned when mould or oxidation occurs (every 20 days).

Jump net inspection and maintenance

The broken ropes should be tied to each other as in the form of a braid and tied by passing through the apparatus and knitting up to the broken rope again. (daily)
When there are breaks from the twist wires in the rope in the jump net, the broken twists should be repaired by adding the broken twists. (daily)
Opened locks of locked apparatus should be closed again, broken locked apparatus should be replaced with a spare (every 7 days).

 

screenshot 1

Whatsapp Contact Whatsapp Contact